239.6 million lb U₃O₈
2.37% U₃O₈
10.7 years
Up to 30 million lb / year
1,300 tonnes
3,000-foot airstrip
Additional 373-bed camp, bringing total capacity to 570 beds
Diffuser installation
Earthworks, roads and construction pads
Shaft terraces, foundations and freeze facilities
Construction of waste management and construction facility pads
Temporary facilities and utilities
Airstrip expansion to 5,840 feet
The ground setting validated by testing provides very high confidence
with respect to the schedule and cost of shaft sinking once in the basement setting
A CLEAR, SEQUENCED PATH TO FIRST PRODUCTION